
PYLONS larger than the new overhead lines in the Tingwall area are being considered by energy giant SSEN for Shetland’s future energy network. If they were installed, they would be located on land between Kergord and a planned large 2GW northern substation hub in the Sullom Voe/Scatsta area. Read more
