
OPTIONS for the possible routing of new overhead power lines in the central and north mainland of Shetland have been revealed. The overhead lines would run from Kergord to near Sullom Voe Terminal. Read more

26th September 2025

OPTIONS for the possible routing of new overhead power lines in the central and north mainland of Shetland have been revealed. The overhead lines would run from Kergord to near Sullom Voe Terminal. Read more